We’ve spent the week removing the old bath, sink, WC and tiling so we can reconfigure this dorma bathroom to accommodate a 1000 x 800 shower cubicle, shower pump, vanity basin and WC.
It’s been very tricky as the height of the dorma limits what can be achieved and the floor joist direct, and construction of the building, prevented the waste pipe being diverted under the floor.
It’s starting to take shape now and we’ll post progress photos as we move along.
Please feel free to like and share on social media.