Final pictures from our latest Bathroom project. All set now for the flooring to be laid and the illuminated mirror to be installed (when it arrives).
In summary we’ve:
- Installed a new Ceiling
- Installed a new Stud Wall with 2 x Cubbyhole Shelves
- Installed new electrics for Downlight’s, Mirror and Extractor Fan.
- Plastered walls and ceiling
- Installed 1200 Shower Enclosure with Mira Mixer Shower.
- Installed 1600 Bath with High Gloss Bath Panel and EASY PLUMB Mixer Tap.
- Installed 400 Vanity Unit with Basin and Mixer Tap.
- Installed Close Coupled WC.
- Installed 450 x 1600 Anthracite Grey Towel Rail.
- Tiling & Decorating
If you like what we’ve achieved here please like and Share on Social Media.